World Countries > Power Stations> United States of America > Bent Tree Wind Farm Phase 1

Bent Tree Wind Farm Phase 1 power station - United States of America

The Bent Tree Wind Farm Phase 1 power station is a 201.3 megawatt (MW) Wind power station in Manchester, MN, USA.

Power Station Name:
Bent Tree Wind Farm Phase 1
Power Station Location:
Manchester, MN, USA
Generation Capacity:
201.3 Megawatt (MW)
Fuel Categories:
Wind
Parent company:
Wisconsin Power & Light Co
Commissioning Year:
2011

Bent Tree Wind Farm Phase 1 On The Map

Other Power Stations